Installation
CLEARANCES
NOTE: Distance on the left-hand side of your Multi-Fuel Furnace is set at 24 inches for suitable access to
the control panel and for fuel loading. This distance may be less, but not less than 7 inches.
INSTALLATION OPTIONS
Read this entire manual before you install and use your Multi-Fuel Furnace. Failure to follow instructions
may result in property damage, bodily injury, or even death!
(See specic installation details for clearances and other installation requirements)
Certied for installation in a Residentail Type home in the USA and Canada. Also may be installed into a Manufactured
or Mobile Home.
As a Primary Furnace—the unit functions independently of any other system. The “Room Air” blowers will come on
when the plenum and exhaust temperatures reach a preset point programmed into the furnace’s circuit board (PCB). Unit
may also be used as a stand-alone shop heater. This is the only approved installation conguration in which ductwork
or return air is not required. All other congurations utilizing a ductwork system must supply return air to the appliance.
As a Secondary (Add-On) Furnace—the unit aids an existing gas/electric furnace helping cut down on operation time.
It is recommended that only a authorized technician install your Multi-Fuel Furnace, preferably an NFI certied specialist.
Installation
IMPROPER INSTALLATION: The manufacturer will not be held responsible for damage caused by the mal-
function of a furnace due to improper venting or installation. Call (800) 750-2723 and/or consult a professional
installer if you have any questions.
FLOOR PROTECTION
This unit must be installed on a non-combustible oor surface. If a
oor pad is used, it should be UL listed or equal. The oor pad or
non-combustible surface should be large enough to extend a minimum
of 6-inches in front, 6-inches on each side, and 1-inch behind the
furnace for horizontal termination.
Floor protection must extend under and 2-inches to each side of the
chimney tee for an interior vertical termination.
A 1 inch thick Floor Protector is recommended with installation.
ADDITIONAL ITEMS REQUIRED FOR INSTALLATION
• UL listed 3 inch or 4 inch (Depending on application) “PL” pellet venting exhaust system.
Air distribution duct work. Transition from 4.5 inch x 18.5 inch rectangle to 10 inch round is provided.
Air lter (Optional). Size: 10 x 20 x 1
• Floor Protection (If not installed on a non-combustible oor)
• Fresh air for combustion: 2 inches[5cm] diameter - If installed in a manufactured / mobile home or located in a small,
tightly constructed room.
Canada requires that the installation of the pellet-fuel furnace shall comply with the applicable requirements of CSA-B365.
Vue de la page 3
1 2 3 4 5 6 7 8 9 ... 12 13

Commentaires sur ces manuels

Pas de commentaire